Return to

(No title)

Hereford Sixth Form CollegeBack to Portfolio

In 2006, Hereford Sixth College opened a £2 million music block. Working alongside the builders and architects, we designed, commissioned and installed the air conditioning system in the development.

The system features three heat recovery variable refrigeration flow air conditioning systems. These offer maximum energy efficiency and therefore low running costs. The warm air that is removed from one area is used to heat another, making it an economical and practical solution.

Dots

Hereford Sixth Form CentreHereford Sixth Form CentreHereford Sixth Form CentreHereford Sixth Form Centre